BAL-001-2
|
Real Power Balancing Control Performance
|
BAL-001-2-NB-0
|
11/17/15
|
01/01/17
|
BAL-002-3
|
Disturbance Control Standard – Contingency Reserve for Recovery from a Balancing Contingency Event
|
BAL-002-3-NB-0
|
02/19/19
|
11/01/19
|
BAL-003-2
|
Frequency Response and Frequency Bias Setting
|
BAL-003-2-NB-0
|
11/18/20
|
12/01/22
|
BAL-005-1 |
Balancing Authority Control
|
BAL-005-1-NB-0 |
04/18/18 |
07/01/19 |
CIP-002-5.1a
|
Cyber Security — BES Cyber System Categorization
|
CIP-002-5.1a-NB-0
|
06/07/17
|
06/07/17
|
CIP-003-8
|
Cyber Security — Security Management Controls
|
CIP-003-8-NB-0
|
12/12/19
|
07/01/20
|
CIP-003-9
|
Cyber Security — Security Management Controls
|
CIP-003-9-NB-0
|
07/27/23
|
10/01/26
|
CIP-004-7
|
Cyber Security — Personnel & Training
|
CIP-004-7-NB-0
|
04/29/22
|
07/01/24
|
CIP-005-7
|
Cyber Security — Electronic Security Perimeter(s) |
CIP-005-7-NB-0
|
07/26/21
|
04/01/23
|
CIP-006-6
|
Cyber Security — Physical Security of BES Cyber Systems
|
CIP-006-6-NB-0
|
09/07/16
|
01/01/17
|
CIP-007-6
|
Cyber Security — System Security Management
|
CIP-007-6-NB-0
|
09/07/16
|
01/01/172
|
CIP-008-6
|
Cyber Security — Incident Reporting and Response Planning
|
CIP-008-6-NB-0
|
11/29/19
|
07/01/21
|
CIP-009-6
|
Cyber Security — Recovery Plans for BES Cyber Systems
|
CIP-009-6-NB-0
|
09/07/16
|
01/01/17
|
CIP-010-4
|
Cyber Security — Configuration Change Management and Vulnerability Assessments
|
CIP-010-4-NB-0
|
07/26/21
|
04/01/23
|
CIP-011-3
|
Cyber Security — Information Protection
|
CIP-011-3-NB-0
|
04/29/22
|
07/01/24
|
CIP-012-1
|
Cyber Security – Communications between Control Centers
|
CIP-012-1-NB-0
|
08/21/20
|
10/01/22
|
CIP-012-2 |
Cyber Security – Communications between Control Centers |
CIP-012-2-NB-0 |
09/26/24
|
10/01/26
|
CIP-013-2
|
Cyber Security - Supply Chain Risk Management
|
CIP-013-2-NB-0
|
07/26/21
|
04/01/23
|
CIP-014-3
|
Physical Security
|
CIP-014-3-NB-0
|
10/28/22
|
10/29/22
|
COM-001-3
|
Communications
|
COM-001-3-NB-0
|
03/16/17
|
01/01/18
|
COM-002-4
|
Operating Personnel Communications Protocols
|
COM-002-4-NB-0
|
12/21/15
|
01/01/17
|
EOP-004-4
|
Event Reporting
|
EOP-004-4-NB-0
|
08/29/18
|
10/01/19
|
EOP-005-3
|
System Restoration from Blackstart Resources
|
EOP-005-3-NB-0
|
08/29/18
|
10/01/19
|
EOP-006-3
|
System Restoration Coordination
|
EOP-006-3-NB-0
|
08/29/18
|
10/01/19
|
EOP-008-2
|
Loss of Control Center Functionality
|
EOP-008-2-NB-0
|
08/29/18
|
10/01/19
|
EOP-010-1
|
Geomagnetic Disturbance Operations
|
EOP-010-1-NB-0
|
01/15/15
|
10/01/15
|
EOP-011-2
|
Emergency Preparedness and Operations
|
EOP-011-2-NB-0
|
12/29/21
|
07/01/23
|
EOP-011-3
|
Emergency Operations
|
EOP-011-3-NB-0
|
06/22/23
|
01/01/25
|
EOP-011-4
|
Emergency Operations
|
EOP-011-3-NB-0
|
07/03/24
|
04/01/25
|
EOP-012-1
|
Extreme Cold Weather Preparedness and Operations
|
EOP-012-1-NB-0
|
06/22/23
|
01/01/25
|
EOP-012-2
|
Extreme Cold Weather Preparedness and Operations
|
EOP-012-2-NB-0
|
11/04/24
|
04/01/25
|
FAC-001-4
|
Facility Interconnection Requirements
|
FAC-001-4-NB-0
|
03/29/23
|
04/01/24
|
FAC-002-4
|
Facility Interconnection Studies
|
FAC-002-4-NB-0
|
03/29/23
|
04/01/24
|
FAC-003-5
|
Transmission Vegetation Management
|
FAC-003-5-NB-0
|
07/14/22
|
10/01/24
|
FAC-008-5
|
Facility Ratings
|
FAC-008-5-NB-0
|
08/25/21
|
01/01/22
|
FAC-010-3
|
System Operating Limits Methodology for the Planning Horizon
|
FAC-010-3-NB-0
|
07/12/16
|
10/01/17
|
FAC-011-4
|
System Operating Limits Methodology for the Operations Horizon
|
FAC-011-4-NB-0
|
07/14/22
|
10/01/24
|
FAC-014-3
|
Establish and Communicate System Operating Limits
|
FAC-014-3-NB-0
|
07/14/22
|
10/01/24
|
INT-006-5
|
Evaluation of Interchange Transactions
|
INT-006-5-NB-0
|
01/22/21
|
07/01/21
|
INT-009-3
|
Implementation of Interchange
|
INT-009-3-NB-0
|
01/22/21
|
07/01/21
|
INT-011-1.1
|
Intra-Balancing Authority Transaction Identification
|
INT-011-1.1-NB-0
|
04/28/15
|
04/28/15
|
IRO-001-4
|
Reliability Coordination – Responsibilities
|
IRO-001-4-NB-0
|
07/12/16
|
10/01/17
|
IRO-002-7
|
Reliability Coordination – Monitoring and Analysis
|
IRO-002-7-NB-0
|
01/22/21
|
07/01/21
|
IRO-006-5
|
Reliability Coordination- Transmission Loading Relief (TLR)
|
|
02/24/12
|
04/01/12
|
IRO-006-EAST-2
|
Transmission Loading Relief Procedure for the Eastern Interconnection
|
IRO-006-EAST-2-NB-0
|
05/24/16
|
10/01/16
|
IRO-008-3
|
Reliability Coordinator Operational Analyses and Real-time Assessments
|
IRO-008-3-NB-0
|
07/14/22
|
10/01/24
|
IRO-009-2
|
Reliability Coordinator Actions to Operate Within IROLs
|
IRO-009-2-NB-0
|
05/24/16
|
07/01/16
|
IRO-010-4
|
Reliability Coordinator Data Specification and Collection
|
IRO-010-4-NB-0
|
12/29/21
|
07/01/23
|
IRO-010-5
|
Reliability Coordinator Data and Information Specification and Collection
|
IRO-010-5-NB-0
|
03/08/24
|
10/01/25
|
IRO-014-3
|
Coordination Among Reliability Coordinators
|
IRO-014-3-NB-0
|
07/12/16
|
10/01/17
|
IRO-017-1
|
Outage Coordination
|
IRO-017-1-NB-0
|
07/12/16
|
10/01/17
|
IRO-018-1(i)
|
Reliability Coordinator Real-time Reliability Monitoring and Analysis Capabilities
|
IRO-018-1(i)-NB-0
|
05/12/17
|
10/01/18
|
MOD-016-1.1
|
Documentation of Data Reporting Requirements for Actual and Forecast Demands, Net Energy for Load, & Controllable Demand-Side Management
|
|
02/23/09
|
02/23/09
|
MOD-017-0.1
|
Aggregated Actual and forecast Demands and Net Energy for Load
|
|
02/23/09
|
02/23/09
|
MOD-018-0
|
Reports of Actual and Forecast Demand
|
|
02/07/06
|
02/07/06
|
MOD-019-0.1
|
Forecasts of Interruptible Demands and DCLM Data
|
|
02/23/09
|
02/23/09
|
MOD-021-1
|
Documentation of the Accounting Methodology for the Effects of Demand-Side Management in Demand and Energy Forecasts
|
|
02/28/11
|
01/01/12
|
MOD-025-2
|
Verification and Data Reporting of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive Power Capability
|
MOD-025-2-NB-0
|
11/12/14
|
01/01/172
|
MOD-026-1
|
Verification of Models and Data for Generator Excitation Control System or Plant Volt/Var Control Functions
|
MOD-026-1-NB-0
|
11/12/14
|
01/01/152
|
MOD-027-1
|
Verification of Models and Data for Turbine/Governor and Load Control or Active Power/Frequency Control Functions
|
MOD-027-1-NB-0
|
11/12/14
|
01/01/152
|
MOD-031-3
|
Demand and Energy Data
|
MOD-031-3-NB-0
|
04/30/21
|
10/01/21
|
MOD-032-1
|
Data for Power System Modeling and Analysis
|
MOD-032-1-NB-0
|
09/22/14
|
10/01/15
|
MOD-033-2
|
Steady-State and Dynamic System Model Validation
|
MOD-033-2-NB-0
|
04/30/21
|
10/01/21
|
NUC-001-4
|
Nuclear Plant Interface Coordination
|
NUC-001-4-NB-0
|
04/30/21
|
10/01/21
|
PER-003-2
|
Operating Personnel Credentials
|
PER-003-2-NB-0
|
04/18/19
|
01/01/20
|
PER-005-2
|
Operations Personnel Training
|
PER-005-2-NB-0
|
11/13/14
|
01/01/17
|
PER-006-1 |
Specific Training for Personnel |
PER-006-1-NB-1
|
01/07/19
|
10/01/21
|
PRC-002-4
|
Disturbance Monitoring and Reporting Requirements
|
PRC-002-4-NB-0
|
08/25/23
|
10/01/24
|
PRC-004-6
|
Protection System Misoperation Identification and Correction
|
PRC-004-6-NB-0
|
01/22/21
|
07/01/21
|
PRC-005-1.1b
|
Transmission and Generation Protection System Maintenance and Testing
|
PRC-005-1.1b-NB-0
|
05/14/14
|
05/14/14
|
PRC-005-6
|
Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance
|
PRC-005-6-NB-0
|
05/17/16
|
07/01/162
|
PRC-006-5
|
Automatic Underfrequency Load Shedding
|
PRC-006-5-NB-0
|
04/30/21
|
10/01/21
|
PRC-006-NPCC-2
|
Automatic Underfrequency Load Shedding
|
PRC-006-NPCC-2-NB-0
|
06/29/20
|
07/01/20
|
PRC-008-0
|
Underfrequency Load Shedding Equipment Maintenance Programs
|
|
02/08/05
|
02/08/05
|
PRC-010-2
|
Undervoltage Load Shedding
|
PRC-010-2-NB-0
|
07/12/16
|
10/02/17
|
PRC-011-0
|
UVLS System Maintenance and Testing
|
|
02/08/05
|
02/08/05
|
PRC-012-2
|
Remedial Action Schemes
|
PRC-012-2-NB-0
|
04/18/18
|
07/01/21
|
PRC-017-1
|
Remedial Action Scheme Maintenance and Testing
|
PRC-017-1-NB-0
|
07/12/16
|
10/01/17
|
PRC-019-2
|
Coordination of Generating Unit or Plant Capabilities, Voltage Regulating Controls, and Protection
|
PRC-019-2-NB-0
|
12/14/15
|
01/01/172
|
PRC-023-6
|
Transmission Relay Loadability
|
PRC-023-6-NB-0
|
06/07/24
|
10/01/24
|
PRC-024-3
|
Frequency and Voltage Protection Settings for Generating Resources
|
PRC-024-3-NB-0
|
11/18/20
|
01/01/23
|
PRC-025-2
|
Generator Relay Loadability
|
PRC-025-2-NB-1
|
01/16/19
|
04/01/19
|
PRC-026-2
|
Relay Performance During Stable Power Swings
|
PRC-026-2-NB-0
|
07/14/22
|
10/01/24
|
PRC-027-1
|
Coordination of Protection Systems for Performance During Faults
|
PRC-027-1-NB-1
|
01/07/19
|
10/01/21
|
TOP-001-6
|
Transmission Operations
|
TOP-001-6-NB-0
|
07/14/22
|
10/01/24
|
TOP-002-4
|
Operations Planning
|
TOP-002-4-NB-0
|
07/12/16
|
10/01/17
|
TOP-002-5
|
Operations Planning
|
TOP-002-5-NB-0
|
07/03/24
|
04/01/26
|
TOP-003-5
|
Operational Reliability Data
|
TOP-003-5-NB-0
|
12/29/21
|
07/01/23
|
TOP-003-6.1
|
Transmission Operator and Balancing Authority Data and Information Specification and Collection
|
TOP-003-6.1-NB-0
|
03/08/24
|
10/01/25
|
TOP-010-1(i)
|
Real-time Reliability Monitoring and Analysis Capabilities
|
TOP-010-1(i)-NB-0
|
05/12/17
|
10/01/18
|
TPL-001-5.1
|
Transmission System Planning Performance Requirements
|
TPL-001-5.1-NB-0
|
10/14/20
|
10/01/23
|
TPL-007-4
|
Transmission System Planned Performance for Geomagnetic Disturbance Events
|
TPL-007-4-NB-0
|
07/27/20
|
04/01/212
|
VAR-001-5
|
Voltage and Reactive Control
|
VAR-001-5-NB-0
|
04/16/19
|
07/01/19
|
VAR-002-4.1
|
Generator Operation for Maintaining Network Voltage Schedules
|
VAR-002-4.1-NB-0
|
02/06/18
|
03/02/18
|