nbeub
HOME  |  CAREERS  |  CONTACT US
  FRANÇAIS
https://nbeub.ca/uploads/images/headers/electricity.jpg
regulatory proceedings
Click here to search for current &
past matters and decisions
Current Max
Regular
Self-serve is

161.5

Current Max
ultra-low sulphur diesel
Self-serve is

178.4

Current Max
heating
oil

147.6

CLICK HERE FOR ALL MAXIMUM PRICES

Reliability Standards

November 27, 2024


NERC Standard

Title

NB Appendix

Approved Date

Effective Date

BAL-001-2

Real Power Balancing Control Performance

BAL-001-2-NB-0

11/17/15

01/01/17

BAL-002-3

Disturbance Control Standard – Contingency Reserve for Recovery from a Balancing Contingency Event

BAL-002-3-NB-0

02/19/19

11/01/19

BAL-003-2

Frequency Response and Frequency Bias Setting

BAL-003-2-NB-0

11/18/20

12/01/22

BAL-005-1

Balancing Authority Control

BAL-005-1-NB-0 04/18/18 07/01/19

CIP-002-5.1a

Cyber Security — BES Cyber System Categorization

CIP-002-5.1a-NB-0

06/07/17

06/07/17

CIP-003-8

Cyber Security — Security Management Controls

CIP-003-8-NB-0

12/12/19

07/01/20

CIP-003-9

Cyber Security — Security Management Controls

CIP-003-9-NB-0

07/27/23

10/01/26

CIP-004-7

Cyber Security — Personnel & Training

CIP-004-7-NB-0

04/29/22

07/01/24

CIP-005-7

Cyber Security — Electronic Security Perimeter(s)

CIP-005-7-NB-0

07/26/21

04/01/23

CIP-006-6

Cyber Security — Physical Security of BES Cyber Systems

CIP-006-6-NB-0

09/07/16

01/01/17

CIP-007-6

Cyber Security — System Security Management

CIP-007-6-NB-0

09/07/16

01/01/172

CIP-008-6

Cyber Security — Incident Reporting and Response Planning

CIP-008-6-NB-0

11/29/19

07/01/21

CIP-009-6

Cyber Security — Recovery Plans for BES Cyber Systems

CIP-009-6-NB-0

09/07/16

01/01/17

CIP-010-4

Cyber Security — Configuration Change Management and Vulnerability Assessments

CIP-010-4-NB-0

07/26/21

04/01/23

CIP-011-3

Cyber Security — Information Protection

CIP-011-3-NB-0

04/29/22

07/01/24

CIP-012-1

Cyber Security – Communications between Control Centers

CIP-012-1-NB-0

08/21/20

10/01/22

CIP-012-2 Cyber Security – Communications between Control Centers CIP-012-2-NB-0

09/26/24

10/01/26

CIP-013-2

Cyber Security - Supply Chain Risk Management

CIP-013-2-NB-0

07/26/21

04/01/23

CIP-014-3

Physical Security

CIP-014-3-NB-0

10/28/22

10/29/22

COM-001-3

Communications

COM-001-3-NB-0

03/16/17

01/01/18

COM-002-4

Operating Personnel Communications Protocols

COM-002-4-NB-0

12/21/15

01/01/17

EOP-004-4

Event Reporting

EOP-004-4-NB-0

08/29/18

10/01/19

EOP-005-3

System Restoration from Blackstart Resources

EOP-005-3-NB-0

08/29/18

10/01/19

EOP-006-3

System Restoration Coordination

EOP-006-3-NB-0

08/29/18

10/01/19

EOP-008-2

Loss of Control Center Functionality

EOP-008-2-NB-0

08/29/18

10/01/19

EOP-010-1

Geomagnetic Disturbance Operations

EOP-010-1-NB-0

01/15/15

10/01/15

EOP-011-2

Emergency Preparedness and Operations

EOP-011-2-NB-0

12/29/21

07/01/23

EOP-011-3

Emergency Operations

EOP-011-3-NB-0

06/22/23

01/01/25

EOP-011-4

Emergency Operations

EOP-011-3-NB-0

07/03/24

04/01/25

EOP-012-1

Extreme Cold Weather Preparedness and Operations

EOP-012-1-NB-0

06/22/23

01/01/25

EOP-012-2

Extreme Cold Weather Preparedness and Operations

EOP-012-2-NB-0

11/04/24

04/01/25

FAC-001-4

Facility Interconnection Requirements

FAC-001-4-NB-0

03/29/23

04/01/24

FAC-002-4

Facility Interconnection Studies

FAC-002-4-NB-0

03/29/23

04/01/24

FAC-003-5

Transmission Vegetation Management

FAC-003-5-NB-0

07/14/22

10/01/24

FAC-008-5

Facility Ratings

FAC-008-5-NB-0

08/25/21

01/01/22

FAC-010-3

System Operating Limits Methodology for the Planning Horizon

FAC-010-3-NB-0

07/12/16

10/01/17

FAC-011-4

System Operating Limits Methodology for the Operations Horizon

FAC-011-4-NB-0

07/14/22

10/01/24

FAC-014-3

Establish and Communicate System Operating Limits

FAC-014-3-NB-0

07/14/22

10/01/24

INT-006-5

Evaluation of Interchange Transactions

INT-006-5-NB-0

01/22/21

07/01/21

INT-009-3

Implementation of Interchange

INT-009-3-NB-0

01/22/21

07/01/21

INT-011-1.1

Intra-Balancing Authority Transaction Identification

INT-011-1.1-NB-0

04/28/15

04/28/15

IRO-001-4

Reliability Coordination – Responsibilities

IRO-001-4-NB-0

07/12/16

10/01/17

IRO-002-7

Reliability Coordination – Monitoring and Analysis

IRO-002-7-NB-0

01/22/21

07/01/21

IRO-006-5

Reliability Coordination- Transmission Loading Relief (TLR)

 

02/24/12

04/01/12

IRO-006-EAST-2

Transmission Loading Relief Procedure for the Eastern Interconnection

IRO-006-EAST-2-NB-0

05/24/16

10/01/16

IRO-008-3

Reliability Coordinator Operational Analyses and Real-time Assessments

IRO-008-3-NB-0

07/14/22

10/01/24

IRO-009-2

Reliability Coordinator Actions to Operate Within IROLs

IRO-009-2-NB-0

05/24/16

07/01/16

IRO-010-4

Reliability Coordinator Data Specification and Collection

IRO-010-4-NB-0

12/29/21

07/01/23

IRO-010-5

Reliability Coordinator Data and Information Specification and Collection

IRO-010-5-NB-0

03/08/24

10/01/25

IRO-014-3

Coordination Among Reliability Coordinators

IRO-014-3-NB-0

07/12/16

10/01/17

IRO-017-1

Outage Coordination

IRO-017-1-NB-0

07/12/16

10/01/17

IRO-018-1(i)

Reliability Coordinator Real-time Reliability Monitoring and Analysis Capabilities

IRO-018-1(i)-NB-0

05/12/17

10/01/18

MOD-016-1.1

Documentation of Data Reporting Requirements for Actual and Forecast Demands, Net Energy for Load, & Controllable Demand-Side Management

 

02/23/09

02/23/09

MOD-017-0.1

Aggregated Actual and forecast Demands and Net Energy for Load

 

02/23/09

02/23/09

MOD-018-0

Reports of Actual and Forecast Demand

 

02/07/06

02/07/06

MOD-019-0.1

Forecasts of Interruptible Demands and DCLM Data

 

02/23/09

02/23/09

MOD-021-1

Documentation of the Accounting Methodology for the Effects of Demand-Side Management in Demand and Energy Forecasts

 

02/28/11

01/01/12

MOD-025-2

Verification and Data Reporting of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive Power Capability

MOD-025-2-NB-0

11/12/14

01/01/172

MOD-026-1

Verification of Models and Data for Generator Excitation Control System or Plant Volt/Var Control Functions

MOD-026-1-NB-0

11/12/14

01/01/152

MOD-027-1

Verification of Models and Data for Turbine/Governor and Load Control or Active Power/Frequency Control Functions

MOD-027-1-NB-0

11/12/14

01/01/152

MOD-031-3

Demand and Energy Data

MOD-031-3-NB-0

04/30/21

10/01/21

MOD-032-1

Data for Power System Modeling and Analysis

MOD-032-1-NB-0

09/22/14

10/01/15

MOD-033-2

Steady-State and Dynamic System Model Validation

MOD-033-2-NB-0

04/30/21

10/01/21

NUC-001-4

Nuclear Plant Interface Coordination

NUC-001-4-NB-0

04/30/21

10/01/21

PER-003-2

Operating Personnel Credentials

PER-003-2-NB-0

04/18/19

01/01/20

PER-005-2

Operations Personnel Training

PER-005-2-NB-0

11/13/14

01/01/17

PER-006-1 Specific Training for Personnel

PER-006-1-NB-1

01/07/19

10/01/21

PRC-002-4

Disturbance Monitoring and Reporting Requirements

PRC-002-4-NB-0

08/25/23

10/01/24

PRC-004-6

Protection System Misoperation Identification and Correction

PRC-004-6-NB-0

01/22/21

07/01/21

PRC-005-1.1b

Transmission and Generation Protection System Maintenance and Testing

PRC-005-1.1b-NB-0

05/14/14

05/14/14

PRC-005-6

Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance

PRC-005-6-NB-0

05/17/16

07/01/162

PRC-006-5

Automatic Underfrequency Load Shedding

PRC-006-5-NB-0

04/30/21

10/01/21

PRC-006-NPCC-2

Automatic Underfrequency Load Shedding

PRC-006-NPCC-2-NB-0

06/29/20

07/01/20

PRC-008-0

Underfrequency Load Shedding Equipment Maintenance Programs

 

02/08/05

02/08/05

PRC-010-2

Undervoltage Load Shedding

PRC-010-2-NB-0

07/12/16

10/02/17

PRC-011-0

UVLS System Maintenance and Testing

 

02/08/05

02/08/05

PRC-012-2

Remedial Action Schemes

PRC-012-2-NB-0

04/18/18

07/01/21

PRC-017-1

Remedial Action Scheme Maintenance and Testing

PRC-017-1-NB-0

07/12/16

10/01/17

PRC-019-2

Coordination of Generating Unit or Plant Capabilities, Voltage Regulating Controls, and Protection

PRC-019-2-NB-0

12/14/15

01/01/172

PRC-023-6

Transmission Relay Loadability

PRC-023-6-NB-0

06/07/24

10/01/24

PRC-024-3

Frequency and Voltage Protection Settings for Generating Resources

PRC-024-3-NB-0

11/18/20

01/01/23

PRC-025-2

Generator Relay Loadability

PRC-025-2-NB-1

01/16/19

04/01/19

PRC-026-2

Relay Performance During Stable Power Swings

PRC-026-2-NB-0

07/14/22

10/01/24

PRC-027-1

Coordination of Protection Systems for Performance During Faults

PRC-027-1-NB-1

01/07/19

10/01/21

TOP-001-6

Transmission Operations

TOP-001-6-NB-0

07/14/22

10/01/24

TOP-002-4

Operations Planning

TOP-002-4-NB-0

07/12/16

10/01/17

TOP-002-5

Operations Planning

TOP-002-5-NB-0

07/03/24

04/01/26

TOP-003-5

Operational Reliability Data

TOP-003-5-NB-0

12/29/21

07/01/23

TOP-003-6.1

Transmission Operator and Balancing Authority Data and Information Specification and Collection

TOP-003-6.1-NB-0

03/08/24

10/01/25

TOP-010-1(i)

Real-time Reliability Monitoring and Analysis Capabilities

TOP-010-1(i)-NB-0

05/12/17

10/01/18

TPL-001-5.1

Transmission System Planning Performance Requirements

TPL-001-5.1-NB-0

10/14/20

10/01/23

TPL-007-4

Transmission System Planned Performance for Geomagnetic Disturbance Events

TPL-007-4-NB-0

07/27/20

04/01/212

VAR-001-5

Voltage and Reactive Control

VAR-001-5-NB-0

04/16/19

07/01/19

VAR-002-4.1

Generator Operation for Maintaining Network Voltage Schedules

VAR-002-4.1-NB-0

02/06/18

03/02/18

 



[1] See Standard for guidance on phased-in enforcement dates.

[2] See NB Appendix for guidance on phased-in enforcement dates.