nbeub
HOME  |  CAREERS  |  CONTACT US twitter
  FRANÇAIS
https://nbeub.ca/uploads/images/headers/electricity.jpg
regulatory proceedings
Click here to search for current &
past matters and decisions
Current Max
Regular
Self-serve is

166.7

Current Max
ultra-low sulphur diesel
Self-serve is

159.7

Current Max
heating
oil

141.2

CLICK HERE FOR ALL MAXIMUM PRICES

Retired Reliability Standards

October 1, 2013 to October 31, 2022

NERC Standard

NB Appendix

Title

Notes

Effective Date

Retirement  Date

BAL-001-0.1a

 

Real Power Balancing Control Performance

Replaced by BAL-001-1

02/23/09

09/30/14

BAL-001-1

BAL-001-1-NB-0

Real Power Balancing Control Performance

Replaced by BAL-001-2

10/01/14

12/31/16

BAL-002-1

 

Disturbance Control Performance

Replaced by  BAL-002.2(i)

04/01/13

03/31/18

BAL-002-2

BAL-002-2-NB-0

Disturbance Control Standard – Contingency Reserve for Recovery from a Balancing Contingency Event

Superseded by BAL-002-2(i)

04/01/18

04/01/18

BAL-002-2(i)

BAL-002-2(i)-NB-0

Disturbance Control Standard – Contingency Reserve for Recovery from a Balancing Contingency Event

Replaced by  BAL-002.3

04/01/18

10/31/19

BAL-003-0.1b

BAL-003-0.1b-NB-0
(Effective 05/14/14)

Frequency Response and Bias

Replaced by BAL-003-1

02/23/09

03/30/15

BAL-003-1

BAL-003-1-NB-0

Frequency Response and Frequency Bias Setting

Replaced by BAL-003-1.1

10/01/15

04/07/16

BAL-004-0

 

Time Error Correction

 

02/24/12

07/01/17

BAL-005-0.2b

BAL-005-0.2b-NB-0
(Effective 06/11/14)

Automatic Generation Control

Replaced by BAL-005-1

11/20/12

06/30/19

CIP-001-2a

 

Sabotage Reporting

Replaced by EOP-004-2

02/24/12

03/31/14

CIP-002-3

 

Cyber Security-Critical Cyber Asset Identification

Replaced by CIP-002-5.1

10/01/11

12/31/16

CIP-002-4

 

Cyber Security-Critical Cyber Asset Identification

Superseded by CIP-002-5.1

n/a

06/25/14

 

CIP-002-5.1-NB-0

Cyber Security - BES Cyber System Categorization

Superseded by CIP-002-5.1-NB-1

n/a

06/29/16

CIP-002-5.1

CIP-002-5.1-NB-1

Cyber Security — BES Cyber System Categorization

Replaced by CIP-002-5.1a

01/01/17

06/06/17

CIP-003-3

CIP-003-3-NB-0
(Effective 06/11/14)

Cyber Security-Security Management Controls

Replaced by CIP-003-6

n/a

06/25/14

CIP-003-4

 

Cyber Security-Security Management Controls

Superseded by CIP-003-5

n/a

06/25/14

 

CIP-003-5-NB-0

Cyber Security-Security Management Controls

Superseded by CIP-003-5-NB-1

n/a

06/29/16

CIP-003-5

CIP-003-5-NB-1

Cyber Security-Security Management Controls

Superseded by CIP-003-6

n/a

12/31/16

CIP-003-6

CIP-003-6-NB-0

Cyber Security — Security Management Controls

Replaced by CIP-003-7

01/01/17

03/21/20

CIP-003-7

CIP-003-7-NB-0

Cyber Security — Security Management Controls

Replaced by CIP-003-8

04/01/20

06/30/20

CIP-004-3a

 

Cyber Security-Personnel and Training

Replaced by CIP-004-6

04/02/13

12/31/16

CIP-004-4a

 

Cyber Security-Personnel and Training

Superseded by CIP-004-5.1

n/a

06/25/14

 

CIP-004-5.1-NB-0

Cyber Security-Personnel and Training

Superseded by CIP-004-5.1-NB-1

n/a

06/29/16

CIP-004-5.1

CIP-004-5.1-NB-1

Cyber Security-Personnel and Training

Superseded by CIP-004-6

n/a

12/31/16

CIP-005-3a

CIP-005-3a-NB-0
(Effective 06/11/14)

Cyber Security-Electronic Security Perimeter(s)

Replaced by CIP-005-5

10/01/12

12/31/16

CIP-005-4a

 

Cyber Security-Electronic Security Perimeter(s)

Superseded by CIP-005-5

n/a

06/25/14

 

CIP-005-5-NB-0

Cyber Security-Electronic Security Perimeter(s)

Superseded by CIP-005-5-NB-1

n/a

06/29/16

 

CIP-005-5-NB-1

Cyber Security-Electronic Security Perimeter(s)

Superseded by CIP-005-5-NB-2

n/a

12/31/16

 

CIP-005-6-NB-0

 

Superseded by CIP-005-6-NB-1

n/a

08/17/20

CIP-005-5

CIP-005-5-NB-2

Cyber Security-Electronic Security Perimeter(s)

Replaced by CIP-005-6

01/01/17

03/31/21

CIP-006-3c

 

Cyber Security-Physical Security of Cyber Assets

Replaced by CIP-006-6

10/01/11

12/31/16

CIP-006-4c

 

Cyber Security-Physical Security of Cyber Assets

Superseded by CIP-006-5

n/a

06/25/14

 

CIP-006-5-NB-0

Cyber Security-Physical Security of BES Cyber Systems

Superseded by CIP-006-5-NB-1

n/a

06/29/16

CIP-006-5

CIP-006-5-NB-1

Cyber Security-Physical Security of BES Cyber Systems

Superseded by CIP-006-6

n/a

12/31/16

CIP-007-3a

CIP-007-3a-NB-0
(Effective 06/11/14)

Cyber Security-Systems Security Management

Replaced by CIP-007-6

10/01/11

12/31/16

CIP-007-4a

 

Cyber Security-Systems Security Management

Superseded by CIP-007-5

n/a

06/25/14

 

CIP-007-5-NB-0

Cyber Security-System Security Management

Superseded by CIP-007-5-NB-1

n/a

06/29/16

CIP-007-5

CIP-007-5-NB-1

Cyber Security-System Security Management

Superseded by CIP-007-6

n/a

12/31/16

CIP-008-3

 

Cyber Security-Incident Reporting and Response Planning

Replaced by CIP-008-6

10/01/11

12/31/16

CIP-008-4

 

Cyber Security-Incident Reporting and Response Planning

Superseded by CIP-008-5

n/a

06/25/14

 

CIP-008-5-NB-0

Cyber Security-Incident Reporting and Response Planning

Superseded by CIP-008-5-NB-1

n/a

06/29/16

CIP-008-5

CIP-008-5-NB-1

Cyber Security — Incident Reporting and Response Planning

Replaced by CIP-008-6

01/01/17

06/30/21

CIP-009-3

 

Cyber Security-Recovery Plans for Critical Cyber Assets

Replaced by CIP-009-6

10/01/11

12/31/16

CIP-009-4

 

Cyber Security-Recovery Plans for Critical Cyber Assets

Superseded by CIP-009-5

n/a

06/25/14

 

CIP-009-5-NB-0

Cyber Security-Recovery Plans for BES Cyber Systems

Superseded by CIP-009-5-NB-1

n/a

06/29/16

CIP-009-5

CIP-009-5-NB-1

Cyber Security-Recovery Plans for BES Cyber Systems

Superseded by CIP-009-6

n/a

12/31/16

 

CIP-010-1-NB-0

Cyber Security - Configuration Change Management and Vulnerability Assessments

Superseded by CIP-010-1-NB-1

n/a

06/29/16

CIP-010-1

CIP-010-1-NB-1

Cyber Security — Configuration Change Management and Vulnerability Assessments

Superseded by CIP-010-2

n/a

12/31/16

 

CIP-010-3-NB-0

 

Superseded by CIP-010-3-NB-1

n/a

08/17/20

CIP-010-2

CIP-010-2-NB-0

Cyber Security — Configuration Change Management and Vulnerability Assessments

Replaced by CIP-010-3

01/01/17

03/31/21

 

CIP-011-1-NB-0

Cyber Security - Information Protection

Superseded by CIP-011-1-NB-1

n/a

06/29/16

CIP-011-1

CIP-011-1-NB-1

Cyber Security — Information Protection

Superseded by CIP-011-2

n/a

12/31/16

 

CIP-013-1-NB-0

 

Superseded by CIP-013-1-NB-1

n/a

08/17/20

CIP-014-1

CIP-014-1-NB-0

Physical Security

Replaced by CIP-014-1

04/01/16

04/01/16

CIP-014-2

CIP-014-2-NB-0

Physical Security

Replaced by CIP-014-3

04/02/16

10/28/22

COM-001-1.1

COM-001-1.1-NB-0
(Effective 03/23/16)

Telecommunications

Replaced by COM-001-2

02/23/09

03/31/16

COM-001-2

COM-001-2-NB-0

Communications

Replaced by COM-001-2.1

04/01/16

04/07/16

COM-001-2.1

COM-001-2.1-NB-0

Communications

Replaced by COM-001-3

04/07/16

12/31/17

COM-002-2

 

Communications and Coordination

Replaced by COM-002-4

11/01/06

12/31/16

EOP-001-2.1b

 

Emergency Operations Planning

n/a

07/01/13

09/30/17

EOP-002-3.1

 

Capacity and Energy Emergencies

n/a

11/20/12

09/30/17

EOP-003-1

 

Load Shedding Plans

Replaced by EOP-003-2

11/01/06

09/30/13

EOP-003-2

 

Load Shedding Plans

n/a

10/01/13

09/30/17

EOP-004-1

 

Disturbance Reporting

Replaced by EOP-004-2

11/01/06

03/31/14

EOP-004-2

 

Event Reporting

Replaced by EOP-004-3

04/01/14

09/30/17

EOP-004-3

EOP-004-3-NB-0

Event Reporting

Replaced by EOP-004-4

10/01/17

09/30/19

EOP-005-2

EOP-005-2-NB-0
(Effective 06/11/14)

System Restoration from Blackstart Resources

Replaced by EOP-005-3

07/01/13

09/30/19

EOP-006-2

 

System Restoration Coordination

Replaced by EOP-006-3

07/01/13

09/30/19

EOP-008-0

 

Plans for Loss of Control Center Functionality

Replaced by EOP-008-1

04/01/05

06/30/13

EOP-008-1

 

Loss of Control Center Functionality

Replaced by EOP-008-2

07/01/13

09/30/19

EOP-009-0

 

Documentation of Blackstart Generating Unit Test Results

Replaced by EOP-008-1

04/01/05

06/30/13

FAC-001-0

 

Facility Connection Requirements

Replaced by FAC-001-1

04/01/05

05/13/14

FAC-001-1

FAC-001-1-NB-0

Facility Connection Requirements

Replaced by FAC-001-2

05/14/14

06/30/16

FAC-001-2

FAC-001-2-NB-0

Facility Interconnection Requirements

Replaced by FAC-001-3

07/01/16

06/30/19

FAC-001-3

FAC-001-3-NB-0

Facility Interconnection Requirements

Replaced by FAC-001-3

07/01/19

07/11/21

FAC-002-1

FAC-002-1-NB-0
(Effective 06/11/14)

Coordination of Plans for New Generation, Transmission and End-User Facilities

Replaced by FAC-002-2

08/01/11

06/30/16

FAC-002-2

FAC-002-2-NB-0

Facility Interconnection Studies

Replaced by FAC-002-3

07/01/16

09/30/21

FAC-003-1

 

Vegetation Management Program

Replaced by FAC-003-3

02/07/06

06/30/14

FAC-003-2

 

Vegetation Management Program

Superseded by FAC-003-3

n/a

05/13/14

FAC-003-3

FAC-003-3-NB-0

Transmission Vegetation Management

Replaced by FAC-003-4

07/01/14

12/31/16

FAC-008-3

FAC-008-3-NB-0
(Effective 06/11/14)

Facility Ratings

Replaced by FAC-008-5

04/01/13

12/31/21

FAC-010-2.1

FAC-010-2.1-NB-0
(Effective 06/11/14)

System Operating Limits Methodology for the Planning Horizon

Replaced by FAC-010-3

02/28/11

09/30/17

FAC-011-2

FAC-011-2-NB-0
(Effective 06/11/14)

System Operating Limits Methodology for the Operations Horizon

Replaced by FAC-011-3

02/23/09

09/30/17

FAC-013-2

FAC-013-2-NB-0
(Effective 06/11/14)

Assessment of Transfer Capability for the Near-term Transmission Horizon

n/a

10/01/17

01/22/21

INT-001-3

 

Interchange Information

Replaced by INT-004-3

11/01/06

03/31/15

INT-003-3

 

Interchange Transaction Implementation

Replaced by INT-009-2

04/01/12

03/31/15

INT-004-2

 

Dynamic Interchange Transaction Modifications

Replaced by INT-004-3

09/09/07

03/31/15

INT-004-3

INT-004-3-NB-0

Dynamic Transfers

Replaced by INT-004-3.1

04/01/15

04/27/15

INT-004-3.1

INT-004-3.1-NB-0

Dynamic Transfers

n/a

04/28/15

01/22/21

INT-005-3

 

Interchange Authority Distributes Arranged Interchange

n/a

02/28/11

03/31/15

INT-006-3

 

Response to Interchange Authority

Replaced by INT-006-4

02/28/11

03/31/15

INT-006-4

INT-006-4-NB-0

Evaluation of Interchange Transactions

Replaced by INT-006-5

04/01/15

06/30/21

INT-007-1

INT-007-1-NB-0

Interchange Confirmation

Replaced by INT-006-4

05/02/06

03/31/15

INT-008-3

 

Interchange Authority Distributes Status

Replaced by INT-006-4

02/28/11

03/31/15

INT-009-1

 

Implementation of Interchange

Replaced by INT-009-2

05/02/06

03/31/15

INT-009-2

INT-009-2-NB-0

Implementation of Interchange

Replaced by INT-009-2.1

04/01/15

04/27/15

INT-009-2.1

INT-009-2.1-NB-0

Implementation of Interchange

Replaced by INT-009-3

04/28/15

06/30/21

INT-010-1

 

Interchange Coordination Exemptions

Replaced by INT-010-2

05/02/06

03/31/15

INT-010-2

INT-010-2-NB-0

Interchange Initiation and Modification for Reliability

Replaced by INT-010-2.1

04/01/15

04/27/15

INT-010-2.1

INT-010-2.1-NB-0

Interchange Initiation and Modification for Reliability

n/a

04/28/15

01/22/21

INT-011-1

INT-011-1-NB-0

Intra-Balancing Authority Transaction Identification

Replaced by INT-011-1.1

04/01/15

04/27/15

IRO-001-1.1

 

Reliability Coordination – Responsibilities and Authorities

Replaced by IRO-001-4

02/23/09

09/30/17

IRO-002-2

 

Reliability Coordination – Facilities

Replaced by IRO-002-4

07/01/09

09/30/17

IRO-002-4

IRO-002-4-NB-0

Reliability Coordination – Monitoring and Analysis

Replaced by IRO-002-5

10/01/17

12/31/17

IRO-002-5

IRO-002-5-NB-0

Reliability Coordination – Monitoring and Analysis

Replaced by IRO-002-6

01/01/18

12/31/19

IRO-002-6

IRO-002-6-NB-0

Reliability Coordination – Monitoring and Analysis

Replaced by IRO-002-7

01/01/20

06/30/21

IRO-003-2

 

Reliability Coordination – Wide Area View

Replaced by IRO-017-1

11/01/06

09/30/17

IRO-004-2

 

Reliability Coordination – Operations Planning

Replaced by IRO-017-1

07/01/09

09/30/17

IRO-005-3.1a

 

Reliability Coordination – Current Day Operations

Replaced by IRO-017-1

07/01/09

09/30/17

IRO-006-EAST-1

IRO-006-EAST-1-NB-0

Transmission Loading Relief Procedure for the Eastern Interconnection

Replaced by IRO-006-EAST-2

07/01/16

10/01/16

IRO-008-1

 

Reliability Coordinator Operational Analyses and Real-time Assessments

Replaced by IRO-008-2

07/01/09

09/30/17

IRO-009-1

 

Reliability Coordinator Actions to Operate Within IROLs

Replaced by IRO-009-2

07/01/09

06/30/16

IRO-010-1a

 

Reliability Coordinator Data Specification and Collection

Replaced by IRO-010-2

01/01/12

09/30/17

IRO-010-2

IRO-010-2-NB-0

Reliability Coordinator Data Specification and Collection

Replaced by IRO-010-3

07/01/17

09/30/21

IRO-014-1

 

Procedures, Processes or Plans to Support Coordination Between Reliability Coordinators

Replaced by IRO-014-3

02/07/06

09/30/17

IRO-015-1

 

Notifications and Information Exchange Between Reliability Coordinators

n/a

02/07/06

09/30/17

IRO-016-1

IRO-016-1-NB-0
(Effective 06/11/14)

Coordination of Real-time Activities Between Reliability Coordinators

n/a

02/07/06

09/30/17

IRO-018-1

IRO-018-1-NB-0

Reliability Coordinator Real-time Reliability Monitoring and Analysis Capabilities

Superseded by IRO-018-1(i)

n/a

05/12/17

MOD-010-0

 

Steady-State Data for Transmission system Modeling and Simulation

Replaced by MOD-033-1

02/07/06

09/30/16

MOD-012-0

 

Dynamics Data for Transmission System Modeling and simulation

Replaced by MOD-033-1

02/07/06

09/30/16

MOD-020-0

 

Providing Interruptible Demands and Direct Control Load Management Data to System Operators and Reliability Coordinators

n/a

02/07/06

01/22/21

MOD-028-1

 

Area Interchange Methodology

Replaced by MOD-028-1

04/01/11

09/30/13

MOD-029-1a

 

Rated System Path Methodology

Replaced by MOD-029-2a

04/01/11

09/30/17

MOD-030-2

 

Flowgate Methodology

Replaced by MOD-030-3

04/01/11

09/30/17

MOD-031-1

MOD-031-1-NB-0

Demand and Energy Data

Replaced by MOD-031-2

01/01/17

03/31/17

MOD-031-2

MOD-031-2-NB-0

Demand and Energy Data

Replaced by MOD-031-3

04/01/17

09/30/21

MOD-033-1

MOD-033-1-NB-0

Steady-State and Dynamic System Model Validation

Replaced by MOD-033-2

10/01/17

09/30/21

NUC-001-2

NUC-001-2-NB-0

Nuclear Plant Interface Coordination

Replaced by NUC-001-2.1

04/01/10

09/10/15

NUC-001-2.1

NUC-001-2.1-NB-0

Nuclear Plant Interface Coordination

Replaced by NUC-001-3

09/10/15

09/30/16

NUC-001-3

NUC-001-3-NB-0

Nuclear Plant Interface Coordination

Replaced by NUC-001-4

10/01/16

09/30/21

PER-001-0.2

 

Operating Personnel Responsibility and Authority

n/a

11/20/12

09/30/17

PER-002-0

 

Operating Personnel Training

Replaced by PER-005-1

02/08/05

03/31/13

PER-003-1

 

Operating Personnel Credentials

Replaced by PER-003-2

04/01/13

03/31/20

PER-005-1

 

System Personnel Training Requirements 1 and 2

Replaced by PER-005-2

04/01/13

12/31/16

PER-005-1

 

System Personnel Training Requirement 3

Replaced by PER-005-2

04/01/10

12/31/16

PER-005-1

 

System Personnel Training Requirement 3.1

Replaced by PER-005-2

04/01/14

12/31/16

 

PER-006-1-NB-0

 

Replaced by PER-006-1-NB-1

n/a

08/17/20

PRC-001-1

 

System Protection Coordination

Replaced by PRC-001-1.1

11/01/07

12/13/15

PRC-001-1.1

PRC-001-1.1-NB-0

System Protection Coordination

Replaced by PRC-001-1.1(ii)

12/14/15

12/14/15

 

PRC-002-2-NB-0

 

Replaced by PRC-002-2-NB-1

01/01/17

08/17/20

PRC-002-NPCC-01

 

Disturbance Monitoring

Replaced by PRC-002-2

02/24/14

12/31/16

PRC-004-2.a

 

Analysis and Mitigation of Transmission and Generation Protection System Misoperations

Replaced by PRC-004-2.1a

04/01/13

05/13/14

PRC-004-2.1a

PRC-004-2.1a-NB-0

Analysis and Mitigation of Transmission and Generation Protection System Misoperations

Replaced by PRC-004-2.1(i)a

05/14/14

12/13/15

PRC-004-2.1(i)a

PRC-004-2.1(i)a-NB-0

Analysis and Mitigation of Transmission and Generation Protection System Misoperations

Replaced by PRC-004-4(i)

12/14/15

12/31/16

PRC-004-3

PRC-004-3-NB-0

Protection System Misoperation Identification and Correction

Replaced by PRC-004-4(i)

01/01/17

12/31/16

PRC-004-3(i)

PRC-004-3(i)-NB-0

Protection System Misoperation Identification and Correction

Replaced by PRC-004-4(i)

01/01/17

12/31/16

PRC-004-4

PRC-004-4-NB-0

Protection System Misoperation Identification and Correction

Replaced by PRC-004-4(i)

01/01/17

12/31/16

PRC-004-4(i)

PRC-004-4(i)-NB-0

Protection System Misoperation Identification and Correction

Replaced by PRC-004-5(i)

01/01/17

09/30/17

PRC-004-5

PRC-004-5-NB-0

Protection System Misoperation Identification and Correction

Replaced by PRC-004-5(i)

10/02/17

09/30/17

PRC-004-5(i)

PRC-004-5(i)-NB-0

Protection System Misoperation Identification and Correction

Replaced by PRC-004-6

10/02/17

06/30/21

PRC-005-1.b

 

Transmission and Generation Protection System Maintenance and Testing

Replaced by PRC-005-1.1b

04/30/12

05/13/14

PRC-005-2

PRC-005-2-NB-0

Protection System Maintenance

Replaced by PRC-005-2(i)

10/01/15

12/13/15

PRC-005-2(i)

PRC-005-2(i)-NB-0

Protection System Maintenance

Replaced by PRC-005-6

12/14/15

09/30/17

PRC-005-2(ii)

PRC-005-2(ii)-NB-0

Protection System Maintenance

Replaced by PRC-005-6

n/a

 

PRC-005-3

PRC-005-3-NB-0

Protection System and Automatic Reclosing Maintenance

Superseded by PRC-005-6

n/a

06/30/16

PRC-005-3(i)

PRC-005-3(i)-NB-0

Protection System and Automatic Reclosing Maintenance

Superseded by PRC-005-6

n/a

06/30/16

PRC-005-4

PRC-005-4-NB-0

Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance

Superseded by PRC-005-6

n/a

06/30/16

PRC-006-1

 

Automatic Underfrequency Load Shedding

Replaced by PRC-006-2

10/01/13

03/31/16

PRC-006-2

PRC-006-2-NB-0

Automatic Underfrequency Load Shedding

Replaced by PRC-006-5

04/01/16

09/30/21

PRC-006-4

PRC-006-4-NB-0

Automatic Underfrequency Load Shedding

Superseded by PRC-006-5

n/a

10/01/21

PRC-006-NPCC-1

 

Automatic Underfrequency Load Shedding (Requirements R1-R7)

Replaced by PRC-006-NPCC-2

01/01/16

06/30/20

PRC-006-NPCC-1

 

Automatic Underfrequency Load Shedding (Requirements R8-R23)

Replaced by PRC-006-NPCC-2

007/01/15

06/30/20

PRC-007-0

 

Assuring Consistency with Regional UFLS Programs

Replaced by PRC-006-1

02/08/05

09/30/13

PRC-009-0

 

UFLS Performance Following an Underfrequency Event

Replaced by PRC-006-1

02/08/05

09/30/13

PRC-010-0

PRC-010-0-NB-0
(Effective 06/11/14)

Assessment of the Design and Effectiveness of UVLS Program

Replaced by PRC-010-1

02/08/05

09/30/17

PRC-010-1

PRC-010-1-NB-0

Undervoltage Load Shedding

Replaced by PRC-010-2

10/01/17

10/01/17

PRC-015-0

 

Special Protection System Data and Documentation

Replaced by PRC-015-1

02/08/05

09/30/17

PRC-016-0.1

 

Special Protection System Misoperations

Replaced by PRC-016-1

02/23/09

09/30/17

PRC-017-0

 

Special Protection System Maintenance and Testing

Replaced by PRC-017-1

02/08/05

09/30/17

PRC-019-1

PRC-019-1-NB-0

Coordination of Generating Unit or Plant Capabilities, Voltage Regulating Controls, and Protection

Replaced by PRC-019-2

n/a

12/31/16

PRC-021-1

 

Under-Voltage Load Shedding Program Data

Replaced by PRC-010-1

02/07/06

09/30/17

PRC-022-1

PRC-022-1-NB-0
(Effective 06/11/14)

Under-Voltage Load Shedding Program Performance

Replaced by PRC-010-1

02/07/06

09/30/17

PRC-023-3

PRC-023-3-NB-0

Transmission Relay Loadability

Replaced by PRC-023-4

04/01/15

09/30/17

PRC-023-2

 

Transmission Relay Loadability Requirements R1 (except R1 10.1), R2 and R3

Replaced by PRC-023-3

07/01/12

03/31/15

PRC-023-2

 

Transmission Relay Loadability Requirement R1 10.1

Replaced by PRC-023-3

01/01/13

03/31/15

PRC-023-2

 

Transmission Relay Loadability Requirement R4 and R5

Replaced by PRC-023-3

01/01/13

03/31/15

PRC-023-2

 

Transmission Relay Loadability Requirement R6

Replaced by PRC-023-3

01/01/14

03/31/15

PRC-024-1

PRC-024-1-NB-0

Generator Frequency and Voltage Protective Relay Settings

Replaced by PRC-024-2

n/a

12/31/16

PRC-025-1

PRC-025-1-NB-0

Generator Relay Loadability

Replaced by  PRC-025-2

04/01/15

03/31/19

 

PRC-027-1-NB-0

 

Replaced by  PRC-027-1-NB-1

n/a

08/17/20

TOP-001-1a

 

Reliability Responsibilities and Authorities

Replaced by TOP-001-3

02/24/12

09/30/17

TOP-001-3

TOP-001-3-NB-0

Transmission Operations

Replaced by TOP-001-4

10/01/17

09/30/18

TOP-001-4

TOP-001-4-NB-0

Transmission Operations

Replaced by TOP-001-5

10/01/18

06/30/21

TOP-002-2.1b

 

Normal Operations Planning

Replaced by TOP-002-4

11/20/12

09/30/17

TOP-003-1

 

Planned Outage Coordination

Replaced By TOP-003-3

07/01/09

09/30/17

TOP-003-3

TOP-003-3-NB-0

Operational Reliability Data

Replaced by TOP-003-4

07/01/17

09/30/21

TOP-004-2

 

Transmission Operations

n/a

02/23/09

09/30/17

TOP-005-2a

 

Operational Reliability Information

n/a

07/01/12

09/30/17

TOP-006-2

 

Monitoring System Conditions

n/a

07/01/09

09/30/17

TOP-007-0

 

Reporting SOL and IROL Violations

n/a

02/08/05

09/30/17

TOP-008-1

 

Response to Transmission Limit Violations

n/a

11/01/06

09/30/17

TOP-010-1

TOP-010-1-NB-0

Real-time Reliability Monitoring and Analysis Capabilities

Superseeded by TOP-010-1(i)

n/a

05/12/17

TPL-001-0.1

 

System Performance Under Normal Conditions

Replaced by TPL-001-4

02/23/09

07/01/16

TPL-001-5

TPL-001-5-NB-0

Transmission System Planning Performance Requirements

Superseeded by TPL-001-5.1

n/a

10/14/20

TPL-003-0a

 

System Performance Following Loss of Two or More BES Elements

Replaced by TPL-003-0b

02/23/09

09/26/13

TPL-004-0

 

System Performance Following Extreme BES Events

Replaced by TPL-004-0a

02/08/05

09/26/13

TPL-007-1

TPL-007-1-NB-0

Transmission System Planned Performance for Geomagnetic Disturbance Events

Replaced by TPL-007-2

01/01/18

09/01/19

TPL-007-2

TPL-007-2-NB-0

Transmission System Planned Performance for Geomagnetic Disturbance Events

Replaced by TPL-007-3

10/01/19

12/31/19

VAR-001-2

 

Voltage and Reactive Control

Replaced by VAR-001-3

01/01/12

03/31/14

VAR-001-3

 

Voltage and Reactive Control

Replaced by VAR-001-4

04/01/14

12/31/14

VAR-001-4

VAR-001-4-NB-0

Voltage and Reactive Control

Replaced by VAR-001-4.1

01/01/15

04/07/16

VAR-001-4.1

VAR-001-4.1-NB-0

Voltage and Reactive Control

Replaced by VAR-001-4.2

04/07/16

03/01/18

VAR-001-4.2

VAR-001-4.2-NB-0

Voltage and Reactive Control

Replaced by VAR-001-5

03/02/18

06/30/19

VAR-002-2b

 

Generator Operation for Maintaining Network Voltage Schedules

Replaced by VAR-002-3

07/01/13

12/31/14

VAR-002-3

VAR-002-3-NB-0

Generator Operation for Maintaining Network Voltage Schedules

Replaced by VAR-002-4

01/01/15

12/13/15

VAR-002-4 VAR-002-4-NB-0 Generator Operation for Maintaining Network Voltage Schedules Replaced by VAR-002-4.1 12/14/15 03/01/18