BAL-001-0.1a
|
|
Real Power Balancing Control Performance
|
Replaced by BAL-001-1
|
02/23/09
|
09/30/14
|
BAL-001-1
|
BAL-001-1-NB-0
|
Real Power Balancing Control Performance
|
Replaced by BAL-001-2
|
10/01/14
|
12/31/16
|
BAL-002-1
|
|
Disturbance Control Performance
|
Replaced by BAL-002.2(i)
|
04/01/13
|
03/31/18
|
BAL-002-2
|
BAL-002-2-NB-0
|
Disturbance Control Standard – Contingency Reserve for Recovery from a Balancing Contingency Event
|
Superseded by BAL-002-2(i)
|
04/01/18
|
04/01/18
|
BAL-002-2(i)
|
BAL-002-2(i)-NB-0
|
Disturbance Control Standard – Contingency Reserve for Recovery from a Balancing Contingency Event
|
Replaced by BAL-002.3
|
04/01/18
|
10/31/19
|
BAL-003-0.1b
|
BAL-003-0.1b-NB-0 (Effective 05/14/14)
|
Frequency Response and Bias
|
Replaced by BAL-003-1
|
02/23/09
|
03/30/15
|
BAL-003-1
|
BAL-003-1-NB-0
|
Frequency Response and Frequency Bias Setting
|
Replaced by BAL-003-1.1
|
10/01/15
|
04/07/16
|
BAL-004-0
|
|
Time Error Correction
|
|
02/24/12
|
07/01/17
|
BAL-005-0.2b
|
BAL-005-0.2b-NB-0 (Effective 06/11/14)
|
Automatic Generation Control
|
Replaced by BAL-005-1
|
11/20/12
|
06/30/19
|
CIP-001-2a
|
|
Sabotage Reporting
|
Replaced by EOP-004-2
|
02/24/12
|
03/31/14
|
CIP-002-3
|
|
Cyber Security-Critical Cyber Asset Identification
|
Replaced by CIP-002-5.1
|
10/01/11
|
12/31/16
|
CIP-002-4
|
|
Cyber Security-Critical Cyber Asset Identification
|
Superseded by CIP-002-5.1
|
n/a
|
06/25/14
|
|
CIP-002-5.1-NB-0
|
Cyber Security - BES Cyber System Categorization
|
Superseded by CIP-002-5.1-NB-1
|
n/a
|
06/29/16
|
CIP-002-5.1
|
CIP-002-5.1-NB-1
|
Cyber Security — BES Cyber System Categorization
|
Replaced by CIP-002-5.1a
|
01/01/17
|
06/06/17
|
CIP-003-3
|
CIP-003-3-NB-0 (Effective 06/11/14)
|
Cyber Security-Security Management Controls
|
Replaced by CIP-003-6
|
n/a
|
06/25/14
|
CIP-003-4
|
|
Cyber Security-Security Management Controls
|
Superseded by CIP-003-5
|
n/a
|
06/25/14
|
|
CIP-003-5-NB-0
|
Cyber Security-Security Management Controls
|
Superseded by CIP-003-5-NB-1
|
n/a
|
06/29/16
|
CIP-003-5
|
CIP-003-5-NB-1
|
Cyber Security-Security Management Controls
|
Superseded by CIP-003-6
|
n/a
|
12/31/16
|
CIP-003-6
|
CIP-003-6-NB-0
|
Cyber Security — Security Management Controls
|
Replaced by CIP-003-7
|
01/01/17
|
03/21/20
|
CIP-003-7
|
CIP-003-7-NB-0
|
Cyber Security — Security Management Controls
|
Replaced by CIP-003-8
|
04/01/20
|
06/30/20
|
CIP-004-3a
|
|
Cyber Security-Personnel and Training
|
Replaced by CIP-004-6
|
04/02/13
|
12/31/16
|
CIP-004-4a
|
|
Cyber Security-Personnel and Training
|
Superseded by CIP-004-5.1
|
n/a
|
06/25/14
|
|
CIP-004-5.1-NB-0
|
Cyber Security-Personnel and Training
|
Superseded by CIP-004-5.1-NB-1
|
n/a
|
06/29/16
|
CIP-004-5.1
|
CIP-004-5.1-NB-1
|
Cyber Security-Personnel and Training
|
Superseded by CIP-004-6
|
n/a
|
12/31/16
|
CIP-005-3a
|
CIP-005-3a-NB-0 (Effective 06/11/14)
|
Cyber Security-Electronic Security Perimeter(s)
|
Replaced by CIP-005-5
|
10/01/12
|
12/31/16
|
CIP-005-4a
|
|
Cyber Security-Electronic Security Perimeter(s)
|
Superseded by CIP-005-5
|
n/a
|
06/25/14
|
|
CIP-005-5-NB-0
|
Cyber Security-Electronic Security Perimeter(s)
|
Superseded by CIP-005-5-NB-1
|
n/a
|
06/29/16
|
|
CIP-005-5-NB-1
|
Cyber Security-Electronic Security Perimeter(s)
|
Superseded by CIP-005-5-NB-2
|
n/a
|
12/31/16
|
|
CIP-005-6-NB-0
|
|
Superseded by CIP-005-6-NB-1
|
n/a
|
08/17/20
|
CIP-005-5
|
CIP-005-5-NB-2
|
Cyber Security-Electronic Security Perimeter(s)
|
Replaced by CIP-005-6
|
01/01/17
|
03/31/21
|
CIP-006-3c
|
|
Cyber Security-Physical Security of Cyber Assets
|
Replaced by CIP-006-6
|
10/01/11
|
12/31/16
|
CIP-006-4c
|
|
Cyber Security-Physical Security of Cyber Assets
|
Superseded by CIP-006-5
|
n/a
|
06/25/14
|
|
CIP-006-5-NB-0
|
Cyber Security-Physical Security of BES Cyber Systems
|
Superseded by CIP-006-5-NB-1
|
n/a
|
06/29/16
|
CIP-006-5
|
CIP-006-5-NB-1
|
Cyber Security-Physical Security of BES Cyber Systems
|
Superseded by CIP-006-6
|
n/a
|
12/31/16
|
CIP-007-3a
|
CIP-007-3a-NB-0 (Effective 06/11/14)
|
Cyber Security-Systems Security Management
|
Replaced by CIP-007-6
|
10/01/11
|
12/31/16
|
CIP-007-4a
|
|
Cyber Security-Systems Security Management
|
Superseded by CIP-007-5
|
n/a
|
06/25/14
|
|
CIP-007-5-NB-0
|
Cyber Security-System Security Management
|
Superseded by CIP-007-5-NB-1
|
n/a
|
06/29/16
|
CIP-007-5
|
CIP-007-5-NB-1
|
Cyber Security-System Security Management
|
Superseded by CIP-007-6
|
n/a
|
12/31/16
|
CIP-008-3
|
|
Cyber Security-Incident Reporting and Response Planning
|
Replaced by CIP-008-6
|
10/01/11
|
12/31/16
|
CIP-008-4
|
|
Cyber Security-Incident Reporting and Response Planning
|
Superseded by CIP-008-5
|
n/a
|
06/25/14
|
|
CIP-008-5-NB-0
|
Cyber Security-Incident Reporting and Response Planning
|
Superseded by CIP-008-5-NB-1
|
n/a
|
06/29/16
|
CIP-008-5
|
CIP-008-5-NB-1
|
Cyber Security — Incident Reporting and Response Planning
|
Replaced by CIP-008-6
|
01/01/17
|
06/30/21
|
CIP-009-3
|
|
Cyber Security-Recovery Plans for Critical Cyber Assets
|
Replaced by CIP-009-6
|
10/01/11
|
12/31/16
|
CIP-009-4
|
|
Cyber Security-Recovery Plans for Critical Cyber Assets
|
Superseded by CIP-009-5
|
n/a
|
06/25/14
|
|
CIP-009-5-NB-0
|
Cyber Security-Recovery Plans for BES Cyber Systems
|
Superseded by CIP-009-5-NB-1
|
n/a
|
06/29/16
|
CIP-009-5
|
CIP-009-5-NB-1
|
Cyber Security-Recovery Plans for BES Cyber Systems
|
Superseded by CIP-009-6
|
n/a
|
12/31/16
|
|
CIP-010-1-NB-0
|
Cyber Security - Configuration Change Management and Vulnerability Assessments
|
Superseded by CIP-010-1-NB-1
|
n/a
|
06/29/16
|
CIP-010-1
|
CIP-010-1-NB-1
|
Cyber Security — Configuration Change Management and Vulnerability Assessments
|
Superseded by CIP-010-2
|
n/a
|
12/31/16
|
|
CIP-010-3-NB-0
|
|
Superseded by CIP-010-3-NB-1
|
n/a
|
08/17/20
|
CIP-010-2
|
CIP-010-2-NB-0
|
Cyber Security — Configuration Change Management and Vulnerability Assessments
|
Replaced by CIP-010-3
|
01/01/17
|
03/31/21
|
|
CIP-011-1-NB-0
|
Cyber Security - Information Protection
|
Superseded by CIP-011-1-NB-1
|
n/a
|
06/29/16
|
CIP-011-1
|
CIP-011-1-NB-1
|
Cyber Security — Information Protection
|
Superseded by CIP-011-2
|
n/a
|
12/31/16
|
|
CIP-013-1-NB-0
|
|
Superseded by CIP-013-1-NB-1
|
n/a
|
08/17/20
|
CIP-014-1
|
CIP-014-1-NB-0
|
Physical Security
|
Replaced by CIP-014-1
|
04/01/16
|
04/01/16
|
CIP-014-2
|
CIP-014-2-NB-0
|
Physical Security
|
Replaced by CIP-014-3
|
04/02/16
|
10/28/22
|
COM-001-1.1
|
COM-001-1.1-NB-0 (Effective 03/23/16)
|
Telecommunications
|
Replaced by COM-001-2
|
02/23/09
|
03/31/16
|
COM-001-2
|
COM-001-2-NB-0
|
Communications
|
Replaced by COM-001-2.1
|
04/01/16
|
04/07/16
|
COM-001-2.1
|
COM-001-2.1-NB-0
|
Communications
|
Replaced by COM-001-3
|
04/07/16
|
12/31/17
|
COM-002-2
|
|
Communications and Coordination
|
Replaced by COM-002-4
|
11/01/06
|
12/31/16
|
EOP-001-2.1b
|
|
Emergency Operations Planning
|
n/a
|
07/01/13
|
09/30/17
|
EOP-002-3.1
|
|
Capacity and Energy Emergencies
|
n/a
|
11/20/12
|
09/30/17
|
EOP-003-1
|
|
Load Shedding Plans
|
Replaced by EOP-003-2
|
11/01/06
|
09/30/13
|
EOP-003-2
|
|
Load Shedding Plans
|
n/a
|
10/01/13
|
09/30/17
|
EOP-004-1
|
|
Disturbance Reporting
|
Replaced by EOP-004-2
|
11/01/06
|
03/31/14
|
EOP-004-2
|
|
Event Reporting
|
Replaced by EOP-004-3
|
04/01/14
|
09/30/17
|
EOP-004-3
|
EOP-004-3-NB-0
|
Event Reporting
|
Replaced by EOP-004-4
|
10/01/17
|
09/30/19
|
EOP-005-2
|
EOP-005-2-NB-0 (Effective 06/11/14)
|
System Restoration from Blackstart Resources
|
Replaced by EOP-005-3
|
07/01/13
|
09/30/19
|
EOP-006-2
|
|
System Restoration Coordination
|
Replaced by EOP-006-3
|
07/01/13
|
09/30/19
|
EOP-008-0
|
|
Plans for Loss of Control Center Functionality
|
Replaced by EOP-008-1
|
04/01/05
|
06/30/13
|
EOP-008-1
|
|
Loss of Control Center Functionality
|
Replaced by EOP-008-2
|
07/01/13
|
09/30/19
|
EOP-009-0
|
|
Documentation of Blackstart Generating Unit Test Results
|
Replaced by EOP-008-1
|
04/01/05
|
06/30/13
|
FAC-001-0
|
|
Facility Connection Requirements
|
Replaced by FAC-001-1
|
04/01/05
|
05/13/14
|
FAC-001-1
|
FAC-001-1-NB-0
|
Facility Connection Requirements
|
Replaced by FAC-001-2
|
05/14/14
|
06/30/16
|
FAC-001-2
|
FAC-001-2-NB-0
|
Facility Interconnection Requirements
|
Replaced by FAC-001-3
|
07/01/16
|
06/30/19
|
FAC-001-3
|
FAC-001-3-NB-0
|
Facility Interconnection Requirements
|
Replaced by FAC-001-3
|
07/01/19
|
07/11/21
|
FAC-002-1
|
FAC-002-1-NB-0 (Effective 06/11/14)
|
Coordination of Plans for New Generation, Transmission and End-User Facilities
|
Replaced by FAC-002-2
|
08/01/11
|
06/30/16
|
FAC-002-2
|
FAC-002-2-NB-0
|
Facility Interconnection Studies
|
Replaced by FAC-002-3
|
07/01/16
|
09/30/21
|
FAC-003-1
|
|
Vegetation Management Program
|
Replaced by FAC-003-3
|
02/07/06
|
06/30/14
|
FAC-003-2
|
|
Vegetation Management Program
|
Superseded by FAC-003-3
|
n/a
|
05/13/14
|
FAC-003-3
|
FAC-003-3-NB-0
|
Transmission Vegetation Management
|
Replaced by FAC-003-4
|
07/01/14
|
12/31/16
|
FAC-008-3
|
FAC-008-3-NB-0 (Effective 06/11/14)
|
Facility Ratings
|
Replaced by FAC-008-5
|
04/01/13
|
12/31/21
|
FAC-010-2.1
|
FAC-010-2.1-NB-0 (Effective 06/11/14)
|
System Operating Limits Methodology for the Planning Horizon
|
Replaced by FAC-010-3
|
02/28/11
|
09/30/17
|
FAC-011-2
|
FAC-011-2-NB-0 (Effective 06/11/14)
|
System Operating Limits Methodology for the Operations Horizon
|
Replaced by FAC-011-3
|
02/23/09
|
09/30/17
|
FAC-013-2
|
FAC-013-2-NB-0 (Effective 06/11/14)
|
Assessment of Transfer Capability for the Near-term Transmission Horizon
|
n/a
|
10/01/17
|
01/22/21
|
INT-001-3
|
|
Interchange Information
|
Replaced by INT-004-3
|
11/01/06
|
03/31/15
|
INT-003-3
|
|
Interchange Transaction Implementation
|
Replaced by INT-009-2
|
04/01/12
|
03/31/15
|
INT-004-2
|
|
Dynamic Interchange Transaction Modifications
|
Replaced by INT-004-3
|
09/09/07
|
03/31/15
|
INT-004-3
|
INT-004-3-NB-0
|
Dynamic Transfers
|
Replaced by INT-004-3.1
|
04/01/15
|
04/27/15
|
INT-004-3.1
|
INT-004-3.1-NB-0
|
Dynamic Transfers
|
n/a
|
04/28/15
|
01/22/21
|
INT-005-3
|
|
Interchange Authority Distributes Arranged Interchange
|
n/a
|
02/28/11
|
03/31/15
|
INT-006-3
|
|
Response to Interchange Authority
|
Replaced by INT-006-4
|
02/28/11
|
03/31/15
|
INT-006-4
|
INT-006-4-NB-0
|
Evaluation of Interchange Transactions
|
Replaced by INT-006-5
|
04/01/15
|
06/30/21 |
INT-007-1
|
INT-007-1-NB-0
|
Interchange Confirmation
|
Replaced by INT-006-4
|
05/02/06
|
03/31/15
|
INT-008-3
|
|
Interchange Authority Distributes Status
|
Replaced by INT-006-4
|
02/28/11
|
03/31/15
|
INT-009-1
|
|
Implementation of Interchange
|
Replaced by INT-009-2
|
05/02/06
|
03/31/15
|
INT-009-2
|
INT-009-2-NB-0
|
Implementation of Interchange
|
Replaced by INT-009-2.1
|
04/01/15
|
04/27/15
|
INT-009-2.1
|
INT-009-2.1-NB-0
|
Implementation of Interchange
|
Replaced by INT-009-3
|
04/28/15
|
06/30/21 |
INT-010-1
|
|
Interchange Coordination Exemptions
|
Replaced by INT-010-2
|
05/02/06
|
03/31/15
|
INT-010-2
|
INT-010-2-NB-0
|
Interchange Initiation and Modification for Reliability
|
Replaced by INT-010-2.1
|
04/01/15
|
04/27/15
|
INT-010-2.1
|
INT-010-2.1-NB-0
|
Interchange Initiation and Modification for Reliability
|
n/a
|
04/28/15
|
01/22/21
|
INT-011-1
|
INT-011-1-NB-0
|
Intra-Balancing Authority Transaction Identification
|
Replaced by INT-011-1.1
|
04/01/15
|
04/27/15
|
IRO-001-1.1
|
|
Reliability Coordination – Responsibilities and Authorities
|
Replaced by IRO-001-4
|
02/23/09
|
09/30/17
|
IRO-002-2
|
|
Reliability Coordination – Facilities
|
Replaced by IRO-002-4
|
07/01/09
|
09/30/17
|
IRO-002-4
|
IRO-002-4-NB-0
|
Reliability Coordination – Monitoring and Analysis
|
Replaced by IRO-002-5
|
10/01/17
|
12/31/17
|
IRO-002-5
|
IRO-002-5-NB-0
|
Reliability Coordination – Monitoring and Analysis
|
Replaced by IRO-002-6
|
01/01/18
|
12/31/19
|
IRO-002-6
|
IRO-002-6-NB-0
|
Reliability Coordination – Monitoring and Analysis
|
Replaced by IRO-002-7
|
01/01/20
|
06/30/21 |
IRO-003-2
|
|
Reliability Coordination – Wide Area View
|
Replaced by IRO-017-1
|
11/01/06
|
09/30/17
|
IRO-004-2
|
|
Reliability Coordination – Operations Planning
|
Replaced by IRO-017-1
|
07/01/09
|
09/30/17
|
IRO-005-3.1a
|
|
Reliability Coordination – Current Day Operations
|
Replaced by IRO-017-1
|
07/01/09
|
09/30/17
|
IRO-006-EAST-1
|
IRO-006-EAST-1-NB-0
|
Transmission Loading Relief Procedure for the Eastern Interconnection
|
Replaced by IRO-006-EAST-2
|
07/01/16
|
10/01/16
|
IRO-008-1
|
|
Reliability Coordinator Operational Analyses and Real-time Assessments
|
Replaced by IRO-008-2
|
07/01/09
|
09/30/17
|
IRO-009-1
|
|
Reliability Coordinator Actions to Operate Within IROLs
|
Replaced by IRO-009-2
|
07/01/09
|
06/30/16
|
IRO-010-1a
|
|
Reliability Coordinator Data Specification and Collection
|
Replaced by IRO-010-2
|
01/01/12
|
09/30/17
|
IRO-010-2
|
IRO-010-2-NB-0 |
Reliability Coordinator Data Specification and Collection
|
Replaced by IRO-010-3
|
07/01/17
|
09/30/21
|
IRO-014-1
|
|
Procedures, Processes or Plans to Support Coordination Between Reliability Coordinators
|
Replaced by IRO-014-3
|
02/07/06
|
09/30/17
|
IRO-015-1
|
|
Notifications and Information Exchange Between Reliability Coordinators
|
n/a
|
02/07/06
|
09/30/17
|
IRO-016-1
|
IRO-016-1-NB-0 (Effective 06/11/14)
|
Coordination of Real-time Activities Between Reliability Coordinators
|
n/a
|
02/07/06
|
09/30/17
|
IRO-018-1
|
IRO-018-1-NB-0
|
Reliability Coordinator Real-time Reliability Monitoring and Analysis Capabilities
|
Superseded by IRO-018-1(i)
|
n/a
|
05/12/17
|
MOD-010-0
|
|
Steady-State Data for Transmission system Modeling and Simulation
|
Replaced by MOD-033-1
|
02/07/06
|
09/30/16
|
MOD-012-0
|
|
Dynamics Data for Transmission System Modeling and simulation
|
Replaced by MOD-033-1
|
02/07/06
|
09/30/16
|
MOD-020-0
|
|
Providing Interruptible Demands and Direct Control Load Management Data to System Operators and Reliability Coordinators
|
n/a
|
02/07/06
|
01/22/21
|
MOD-028-1
|
|
Area Interchange Methodology
|
Replaced by MOD-028-1
|
04/01/11
|
09/30/13
|
MOD-029-1a
|
|
Rated System Path Methodology
|
Replaced by MOD-029-2a
|
04/01/11
|
09/30/17
|
MOD-030-2
|
|
Flowgate Methodology
|
Replaced by MOD-030-3
|
04/01/11
|
09/30/17
|
MOD-031-1
|
MOD-031-1-NB-0
|
Demand and Energy Data
|
Replaced by MOD-031-2
|
01/01/17
|
03/31/17
|
MOD-031-2
|
MOD-031-2-NB-0
|
Demand and Energy Data
|
Replaced by MOD-031-3
|
04/01/17
|
09/30/21
|
MOD-033-1
|
MOD-033-1-NB-0
|
Steady-State and Dynamic System Model Validation
|
Replaced by MOD-033-2
|
10/01/17
|
09/30/21
|
NUC-001-2
|
NUC-001-2-NB-0
|
Nuclear Plant Interface Coordination
|
Replaced by NUC-001-2.1
|
04/01/10
|
09/10/15
|
NUC-001-2.1
|
NUC-001-2.1-NB-0
|
Nuclear Plant Interface Coordination
|
Replaced by NUC-001-3
|
09/10/15
|
09/30/16
|
NUC-001-3
|
NUC-001-3-NB-0 |
Nuclear Plant Interface Coordination
|
Replaced by NUC-001-4
|
10/01/16
|
09/30/21
|
PER-001-0.2
|
|
Operating Personnel Responsibility and Authority
|
n/a
|
11/20/12
|
09/30/17
|
PER-002-0
|
|
Operating Personnel Training
|
Replaced by PER-005-1
|
02/08/05
|
03/31/13
|
PER-003-1
|
|
Operating Personnel Credentials
|
Replaced by PER-003-2
|
04/01/13
|
03/31/20
|
PER-005-1
|
|
System Personnel Training Requirements 1 and 2
|
Replaced by PER-005-2
|
04/01/13
|
12/31/16
|
PER-005-1
|
|
System Personnel Training Requirement 3
|
Replaced by PER-005-2
|
04/01/10
|
12/31/16
|
PER-005-1
|
|
System Personnel Training Requirement 3.1
|
Replaced by PER-005-2
|
04/01/14
|
12/31/16
|
|
PER-006-1-NB-0
|
|
Replaced by PER-006-1-NB-1
|
n/a
|
08/17/20
|
PRC-001-1
|
|
System Protection Coordination
|
Replaced by PRC-001-1.1
|
11/01/07
|
12/13/15
|
PRC-001-1.1
|
PRC-001-1.1-NB-0
|
System Protection Coordination
|
Replaced by PRC-001-1.1(ii)
|
12/14/15
|
12/14/15
|
|
PRC-002-2-NB-0
|
|
Replaced by PRC-002-2-NB-1
|
01/01/17
|
08/17/20
|
PRC-002-NPCC-01
|
|
Disturbance Monitoring
|
Replaced by PRC-002-2
|
02/24/14
|
12/31/16
|
PRC-004-2.a
|
|
Analysis and Mitigation of Transmission and Generation Protection System Misoperations
|
Replaced by PRC-004-2.1a
|
04/01/13
|
05/13/14
|
PRC-004-2.1a
|
PRC-004-2.1a-NB-0
|
Analysis and Mitigation of Transmission and Generation Protection System Misoperations
|
Replaced by PRC-004-2.1(i)a
|
05/14/14
|
12/13/15
|
PRC-004-2.1(i)a
|
PRC-004-2.1(i)a-NB-0
|
Analysis and Mitigation of Transmission and Generation Protection System Misoperations
|
Replaced by PRC-004-4(i)
|
12/14/15
|
12/31/16
|
PRC-004-3
|
PRC-004-3-NB-0
|
Protection System Misoperation Identification and Correction
|
Replaced by PRC-004-4(i)
|
01/01/17
|
12/31/16
|
PRC-004-3(i)
|
PRC-004-3(i)-NB-0
|
Protection System Misoperation Identification and Correction
|
Replaced by PRC-004-4(i)
|
01/01/17
|
12/31/16
|
PRC-004-4
|
PRC-004-4-NB-0
|
Protection System Misoperation Identification and Correction
|
Replaced by PRC-004-4(i)
|
01/01/17
|
12/31/16
|
PRC-004-4(i)
|
PRC-004-4(i)-NB-0
|
Protection System Misoperation Identification and Correction
|
Replaced by PRC-004-5(i)
|
01/01/17
|
09/30/17
|
PRC-004-5
|
PRC-004-5-NB-0
|
Protection System Misoperation Identification and Correction
|
Replaced by PRC-004-5(i)
|
10/02/17
|
09/30/17
|
PRC-004-5(i)
|
PRC-004-5(i)-NB-0
|
Protection System Misoperation Identification and Correction
|
Replaced by PRC-004-6
|
10/02/17
|
06/30/21 |
PRC-005-1.b
|
|
Transmission and Generation Protection System Maintenance and Testing
|
Replaced by PRC-005-1.1b
|
04/30/12
|
05/13/14
|
PRC-005-2
|
PRC-005-2-NB-0
|
Protection System Maintenance
|
Replaced by PRC-005-2(i)
|
10/01/15
|
12/13/15
|
PRC-005-2(i)
|
PRC-005-2(i)-NB-0
|
Protection System Maintenance
|
Replaced by PRC-005-6
|
12/14/15
|
09/30/17
|
PRC-005-2(ii)
|
PRC-005-2(ii)-NB-0
|
Protection System Maintenance
|
Replaced by PRC-005-6
|
n/a
|
|
PRC-005-3
|
PRC-005-3-NB-0
|
Protection System and Automatic Reclosing Maintenance
|
Superseded by PRC-005-6
|
n/a
|
06/30/16
|
PRC-005-3(i)
|
PRC-005-3(i)-NB-0
|
Protection System and Automatic Reclosing Maintenance
|
Superseded by PRC-005-6
|
n/a
|
06/30/16
|
PRC-005-4
|
PRC-005-4-NB-0
|
Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance
|
Superseded by PRC-005-6
|
n/a
|
06/30/16
|
PRC-006-1
|
|
Automatic Underfrequency Load Shedding
|
Replaced by PRC-006-2
|
10/01/13
|
03/31/16
|
PRC-006-2
|
PRC-006-2-NB-0
|
Automatic Underfrequency Load Shedding
|
Replaced by PRC-006-5
|
04/01/16
|
09/30/21
|
PRC-006-4
|
PRC-006-4-NB-0
|
Automatic Underfrequency Load Shedding
|
Superseded by PRC-006-5
|
n/a
|
10/01/21
|
PRC-006-NPCC-1
|
|
Automatic Underfrequency Load Shedding (Requirements R1-R7)
|
Replaced by PRC-006-NPCC-2
|
01/01/16
|
06/30/20
|
PRC-006-NPCC-1
|
|
Automatic Underfrequency Load Shedding (Requirements R8-R23)
|
Replaced by PRC-006-NPCC-2
|
007/01/15
|
06/30/20
|
PRC-007-0
|
|
Assuring Consistency with Regional UFLS Programs
|
Replaced by PRC-006-1
|
02/08/05
|
09/30/13
|
PRC-009-0
|
|
UFLS Performance Following an Underfrequency Event
|
Replaced by PRC-006-1
|
02/08/05
|
09/30/13
|
PRC-010-0
|
PRC-010-0-NB-0 (Effective 06/11/14)
|
Assessment of the Design and Effectiveness of UVLS Program
|
Replaced by PRC-010-1
|
02/08/05
|
09/30/17
|
PRC-010-1
|
PRC-010-1-NB-0
|
Undervoltage Load Shedding
|
Replaced by PRC-010-2
|
10/01/17
|
10/01/17
|
PRC-015-0
|
|
Special Protection System Data and Documentation
|
Replaced by PRC-015-1
|
02/08/05
|
09/30/17
|
PRC-016-0.1
|
|
Special Protection System Misoperations
|
Replaced by PRC-016-1
|
02/23/09
|
09/30/17
|
PRC-017-0
|
|
Special Protection System Maintenance and Testing
|
Replaced by PRC-017-1
|
02/08/05
|
09/30/17
|
PRC-019-1
|
PRC-019-1-NB-0
|
Coordination of Generating Unit or Plant Capabilities, Voltage Regulating Controls, and Protection
|
Replaced by PRC-019-2
|
n/a
|
12/31/16
|
PRC-021-1
|
|
Under-Voltage Load Shedding Program Data
|
Replaced by PRC-010-1
|
02/07/06
|
09/30/17
|
PRC-022-1
|
PRC-022-1-NB-0 (Effective 06/11/14)
|
Under-Voltage Load Shedding Program Performance
|
Replaced by PRC-010-1
|
02/07/06
|
09/30/17
|
PRC-023-3
|
PRC-023-3-NB-0
|
Transmission Relay Loadability
|
Replaced by PRC-023-4
|
04/01/15
|
09/30/17
|
PRC-023-2
|
|
Transmission Relay Loadability Requirements R1 (except R1 10.1), R2 and R3
|
Replaced by PRC-023-3
|
07/01/12
|
03/31/15
|
PRC-023-2
|
|
Transmission Relay Loadability Requirement R1 10.1
|
Replaced by PRC-023-3
|
01/01/13
|
03/31/15
|
PRC-023-2
|
|
Transmission Relay Loadability Requirement R4 and R5
|
Replaced by PRC-023-3
|
01/01/13
|
03/31/15
|
PRC-023-2
|
|
Transmission Relay Loadability Requirement R6
|
Replaced by PRC-023-3
|
01/01/14
|
03/31/15
|
PRC-024-1
|
PRC-024-1-NB-0
|
Generator Frequency and Voltage Protective Relay Settings
|
Replaced by PRC-024-2
|
n/a
|
12/31/16
|
PRC-025-1
|
PRC-025-1-NB-0
|
Generator Relay Loadability
|
Replaced by PRC-025-2
|
04/01/15
|
03/31/19
|
|
PRC-027-1-NB-0
|
|
Replaced by PRC-027-1-NB-1
|
n/a
|
08/17/20
|
TOP-001-1a
|
|
Reliability Responsibilities and Authorities
|
Replaced by TOP-001-3
|
02/24/12
|
09/30/17
|
TOP-001-3
|
TOP-001-3-NB-0
|
Transmission Operations
|
Replaced by TOP-001-4
|
10/01/17
|
09/30/18
|
TOP-001-4
|
TOP-001-4-NB-0
|
Transmission Operations
|
Replaced by TOP-001-5
|
10/01/18
|
06/30/21
|
TOP-002-2.1b
|
|
Normal Operations Planning
|
Replaced by TOP-002-4
|
11/20/12
|
09/30/17
|
TOP-003-1
|
|
Planned Outage Coordination
|
Replaced By TOP-003-3
|
07/01/09
|
09/30/17
|
TOP-003-3
|
TOP-003-3-NB-0 |
Operational Reliability Data
|
Replaced by TOP-003-4
|
07/01/17
|
09/30/21
|
TOP-004-2
|
|
Transmission Operations
|
n/a
|
02/23/09
|
09/30/17
|
TOP-005-2a
|
|
Operational Reliability Information
|
n/a
|
07/01/12
|
09/30/17
|
TOP-006-2
|
|
Monitoring System Conditions
|
n/a
|
07/01/09
|
09/30/17
|
TOP-007-0
|
|
Reporting SOL and IROL Violations
|
n/a
|
02/08/05
|
09/30/17
|
TOP-008-1
|
|
Response to Transmission Limit Violations
|
n/a
|
11/01/06
|
09/30/17
|
TOP-010-1
|
TOP-010-1-NB-0
|
Real-time Reliability Monitoring and Analysis Capabilities
|
Superseeded by TOP-010-1(i)
|
n/a
|
05/12/17
|
TPL-001-0.1
|
|
System Performance Under Normal Conditions
|
Replaced by TPL-001-4
|
02/23/09
|
07/01/16
|
TPL-001-5
|
TPL-001-5-NB-0
|
Transmission System Planning Performance Requirements
|
Superseeded by TPL-001-5.1
|
n/a
|
10/14/20
|
TPL-003-0a
|
|
System Performance Following Loss of Two or More BES Elements
|
Replaced by TPL-003-0b
|
02/23/09
|
09/26/13
|
TPL-004-0
|
|
System Performance Following Extreme BES Events
|
Replaced by TPL-004-0a
|
02/08/05
|
09/26/13
|
TPL-007-1
|
TPL-007-1-NB-0
|
Transmission System Planned Performance for Geomagnetic Disturbance Events
|
Replaced by TPL-007-2
|
01/01/18
|
09/01/19
|
TPL-007-2
|
TPL-007-2-NB-0
|
Transmission System Planned Performance for Geomagnetic Disturbance Events
|
Replaced by TPL-007-3
|
10/01/19
|
12/31/19
|
VAR-001-2
|
|
Voltage and Reactive Control
|
Replaced by VAR-001-3
|
01/01/12
|
03/31/14
|
VAR-001-3
|
|
Voltage and Reactive Control
|
Replaced by VAR-001-4
|
04/01/14
|
12/31/14
|
VAR-001-4
|
VAR-001-4-NB-0
|
Voltage and Reactive Control
|
Replaced by VAR-001-4.1
|
01/01/15
|
04/07/16
|
VAR-001-4.1
|
VAR-001-4.1-NB-0
|
Voltage and Reactive Control
|
Replaced by VAR-001-4.2
|
04/07/16
|
03/01/18
|
VAR-001-4.2
|
VAR-001-4.2-NB-0
|
Voltage and Reactive Control
|
Replaced by VAR-001-5
|
03/02/18
|
06/30/19
|
VAR-002-2b
|
|
Generator Operation for Maintaining Network Voltage Schedules
|
Replaced by VAR-002-3
|
07/01/13
|
12/31/14
|
VAR-002-3
|
VAR-002-3-NB-0
|
Generator Operation for Maintaining Network Voltage Schedules
|
Replaced by VAR-002-4
|
01/01/15
|
12/13/15
|
VAR-002-4 |
VAR-002-4-NB-0 |
Generator Operation for Maintaining Network Voltage Schedules |
Replaced by VAR-002-4.1 |
12/14/15 |
03/01/18 |